OUR COMPLETED Works

2 x EDG Skids + Spares

Transportation of 2 x EDG skids + Spare parts from SMP Yard to Offshore Marine Centre.
Barging operation was done by our friends over at Infiniti Marine Pte Ltd.

Cold Room Panels

Unstuffing of Cold Room panels for a Cold Room project in Singapore.
10 x 40GP containers out of 200++ containers.

SPE / SPMT / SPACER / PPU / RORO RAMP / SPARE

FORWARD SHIPMENT: Loading of numerous SPE / SPMT / SPACER / PPU / RORO RAMP / SPARE at Yew Choon Yard for a shipment ex Singapore to Cebu. Following by a Ferry load out by Yew Choon in Cebu

13 x Flat Rack / 1 x 40OT / 1 x 40GP / 1 x 20GP single shipment

2 x Vessel Tank

Direct receiving at Jurong Port with our exclusive and trusted partner, of 2 x Vessel Tanks

17.37 x 4.32 x 4.42 (m) L/W/H @ 41 Tons / each

Delivery was done to 2a Refinery Road (Peck Tiong Choon open yard)

Emergency Diesel Generator Skid #4

Transportation of another EDG Skid for a key client of ours to our yard for storage.

Trailer configuration: 1 x 2 x 10
Type: THP/SLDimensions of skid: 9.00 x 5.31 x 5.70 (m) L/W/H
Weight: 34 Tons

Emergency Diesel Generator Skid #3

Transportation of another EDG Skid for a key client of ours, from their fabrication yard to our yard for storage

Trailer configuration: 1 x 2 x 10
Type: THP/SL

Dimensions of skid: 9.00 x 5.31 x 5.70 (m) L/W/H
Weight: 34 Tons

Emergency Diesel Generator Skid #1 #2

Our partner and us, successfully transported along with the help of auxiliary escorts. 2 Units of Diesel Generators for one of our key customer. From their fabrication workshop to our yard for storage.

Dimensions and weight per skid: 15.29 x 5.26 x 6.76 (m) L/W/H at 81 Tons

Total packages:
2 x skids
7 x crates

Diesel Tank transportation

Transportation of 2 x Diesel Tanks from Gul Lane to Offshore Marine Center

Dimensions: 4.00 x 2.20 x 4.18 (m) L/W/H per skid
Weight: 14 Tons per skid

Internal shifting

Internal shifting of an Oil and Gas skid for a key client of ours.
Using 1 x 6 Axles THP/SL trailer.

TBM Slurry Treatment Plant #3

Collection + Transportation + Stuffing/Loading + Freight of a TBM STP from Malaysia to Germany

UTEC direct loading at Jurong Port #2

Direct loading at Jurong Port.
Items: Cutterhead / Front Shield / Middle Shield

UTEC transportation #2

Transportation via auxially police escort from Hiap Tong yard to Jurong Port. (Cutterhead / Front Shield / Middle Shield)

UTEC direct loading at Jurong Port #1

Loading of TBM backup gantries at Jurong Port

UTEC transportation #1

Transportation of TBM backup gantries from Hiap Tong yard to Jurong Port. With the help of the superb outriders from CISCO

UTEC TBM jack up

Jack up at Hiap Tong Yard: Middle Shield / Front Shield / Cutterhead